From: route@monster.com
Sent: Friday, April 15, 2016 10:21 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Page | 1 Glynn
Killgore 410
Bismark
Phone: (830)556-7972 Seguin,
TX 78155Email: gjkillgore@gmail.com Currently in USAQA/QC Telecommunications Specialist BICSI Certified, OSHA Certified SUMMARYActive Secret Clearance Over (19) nineteen years experience in telecommunications
industry. Looking for an opportunity to expand my knowledge in QA/QC,
OSP and ISP communications field. Ability to direct complex projects from
concept to fully operational status. Goal-oriented individual with strong
leadership capabilities. Organized, highly motivated, and
detail-directed problem solver. Areas of Expertise: OSP/ ISP;
reading blueprints, doing redline changes and as-built drawings. Doing on
site QA/QC inspections; managing materials and time to meet deadlines of the
contract; Always with safety orientated, Build out work closets; Install ,
Terminate , Splice, Test copper and optical fiber; Working up as-builds;
Documenting test results. Willing to relocate. RELEVANT
EXPERIENCE ·
Extensive work with all branches
of the military and NATO both CONUS and OCONUS ·
Strong leader with excellent
customer service, communication, problem solving, and organizational skills ·
Trained, supervised and evaluated
staff up to as many as 50 employees ·
Managed multiple projects that
were completed on time and under budget for materials and labor ·
Managed 18 month 1.4 Million
dollar DOD contract for OSP cabling. Completed on time and under budget ·
CJOC in Kabul, Afghanistan that
consisted of 546 locations of 9 different networks all completed in 60 days ·
SDC and JDIC buildings inside
DFIP; consisted of installation of raised tile floor (3000sq.ft each), 150
data locations and OSP fiber and copper, completed in 30 days ·
Installed OSP fiber run of over 3
miles for force protection at the Bagram DFIP to include a system of conduits
and 19 Man Holes ·
Installation of racks, ladder
rack, rack and stack switches connect patch cords ·
Bonding all racks and equipment to
ground ·
Test and certify all network
cabling ·
Take care of all Red Line Drawings
for final As-Built drawings ·
Maintained communications for the
US military in various locations in Afghanistan ·
Proficient planner, surveyor,
troubleshooting and installer ·
Daily, weekly and monthly progress
reports CAREER
EXPERIENCE Ampcus
Inc. Northeast
region
April 2014-present IT
Infrastructure Engineer · Provide input in all planning meetings · Make site visits to insure contractors are following job
specs and standards · Send reports to the USARC G6 for review EMW
Inc.-Bagram
Afghanistan
May 2013-May 2014 Cable
installer ·
Installation of cable tray, Cat6A
shielded cable, and racks ·
Bonding all cable tray, racks, and
cables ·
Testing and troubleshooting cables ·
Terminating Fiber Optic and Copper
cabling Isis
Innovations LLC- All
Afghanistan
May 2011- Dec 2012 Project
Manager ·
Responsible for Isis Innovation’s
compliance to the Army’s I3MP program across the Afghanistan theater ·
Supervise, train and evaluate
staff up to 55 employees. in charge of ordering materials, meet with the Army
planning staff on expansion of the base to provide communication support for
the military ·
Have supervised 15 OSP project in
Afghanistan totaling APX. 100 Man Holes and thousands of feet of optical
fiber and multi pair copper cable. And getting all deliverable’s, such as
site drawings, footages and all as built drawings turned into the military
without missing a deadline ·
Terminating Fiber Optic and Copper
cabling USIDC
Inc. - Kabul, Afghanistan (Camp Phoenix) Aug 2009 – May 2011 Country
Manager / Project Manager ·
Responsible for USIDC’s compliance
to the Army’s I3MP program across the Afghanistan theater ·
Supervise, train and evaluate
staff up to 55 employees. in charge of ordering materials, meet with the Army
planning staff on expansion of the base to provide communication support for
the military ·
Have supervised 8 OSP project in
Afghanistan totaling APX. 50 Man Holes and thousands of feet of optical fiber
and multi pair copper cable. And getting all deliverable’s, such as site
drawings, footages and all as built drawings turned into the military without
missing a deadline ·
Terminating Fiber Optic and Copper
cabling ITT
Systems - Bagram, AfghanistanAug 2008 - Aug 2009 Outside
Plant (OSP) Supervisor ·
Supervise, train and evaluate
staff up to 55 employees. in charge of ordering materials, meet with the Army
planning staff on expansion of the base to provide communication support for
the military ·
Install and maintain required
copper and fiber cables. ·
Terminate and test cables. ·
Attend planning meeting s for
future required communications ·
Terminating Fiber Optic and Copper
cabling CNR
Communications – Seguin, TX2004-2008 Project
Manager/Lead Technician ·
Installed voice, data and fiber
optic cabling to support multiple military installations and Universities. ·
Managed project to install
wireless access points. ·
Terminating Fiber Optic and Copper
cabling ·
Testing Fiber Optic and Copper
cables TSI Inc.
– Waco, TX2003-2004 Project
Manager/Lead Technician ·
Managed team to install structure
cabling throughout warehouse and office space. $90K project. ·
Troubleshooting and maintaining
structure cabling. ·
Supervised and trained 10 to 20
technicians. Carroll
Systems -Austin, TX2001-2003 Project
Manager/Lead Technician ·
Supervised, trained, and evaluated
10 technicians. ·
Install, troubleshoot and maintain
cabling to include data and fiber optics. ·
Splice copper multi pair and
fiber. ·
Terminate 66, 110 blocks, patch
panels and cat5/6 modular plugs. ·
Managed dispatch team throughout
United States. ACS
Dataline – Austin and Houston, TX1995-2001 Lead
Technician ·
Supervised multiple projects with
10 employees installing new structure and OSP cabling for Dell, Cisco, Alcon
Surgical and various school districts. ·
Supervised operation and
maintenance contract with Motorola with 30 technicians. ·
Four time technician of the month
awards and technician of the year award. EDUCATION Leander
High School - Leander, TX1978 High
School Diploma PROFESSIONAL
CERTIFICATIONS BISCI ITS
Technician Installation Program Certification1999 OSHA 30
Training in Construction Safety & Health 2010 Additional
Certifications: Avaya,
Belden, Panduit, Leviton, Ortronics, Hellermann Tyton, Sumitomo Air Blown
Fiber, Seimon, Draka Molex, Hubbell OTHER Active
Secret Clearance - Expiration 2018 CRC
Attended in Aug 2008 Passport
- Exp 2016 CAC –
Expiration Date August 2016 Has
Helmet and Flight Vest – MILAIR Flight Ready Prefers
Kandahar if possible References
upon request |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|