From:                              route@monster.com

Sent:                               Friday, April 15, 2016 10:21 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: CS UT

 

This resume has been forwarded to you at the request of Monster User xapeix03

Glynn Killgore 

Last updated:  12/11/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Seguin, TX  78155
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Glynn Killgore QC Specialist

Resume Value: 5zx5tv6uddvtwiry   

  

 

Page | 1

 

Glynn Killgore

410 Bismark              Phone:  (830)556-7972

Seguin, TX  78155Emailgjkillgore@gmail.com

 

Currently in USAQA/QC Telecommunications Specialist

BICSI Certified, OSHA Certified

SUMMARYActive Secret Clearance

 

Over (19) nineteen years experience in telecommunications industry.  Looking for an opportunity to expand my knowledge in QA/QC, OSP and ISP communications field. Ability to direct complex projects from concept to fully operational status. Goal-oriented individual with strong leadership capabilities.  Organized, highly motivated, and detail-directed problem solver.  Areas of Expertise:  OSP/ ISP; reading blueprints, doing redline changes and as-built drawings. Doing on site QA/QC inspections; managing materials and time to meet deadlines of the contract; Always with safety orientated, Build out work closets; Install , Terminate , Splice, Test copper and optical fiber; Working up as-builds; Documenting test results.  Willing to relocate.

 

RELEVANT EXPERIENCE

 

·   Extensive work with all branches of the military and NATO both CONUS and OCONUS

·   Strong leader with excellent customer service, communication, problem solving, and organizational skills

·   Trained, supervised and evaluated staff up to as many as 50 employees

·   Managed multiple projects that were completed on time and under budget for materials and labor

·   Managed 18 month 1.4 Million dollar DOD contract for OSP cabling. Completed on time and under budget

·   CJOC in Kabul, Afghanistan that consisted of 546 locations of 9 different networks all completed in 60 days

·   SDC and JDIC buildings inside DFIP; consisted of installation of raised tile floor (3000sq.ft each), 150 data locations and OSP fiber and copper, completed in 30 days

·   Installed OSP fiber run of over 3 miles for force protection at the Bagram DFIP to include a system of conduits and 19 Man Holes

·   Installation of racks, ladder rack, rack and stack switches connect patch cords

·   Bonding all racks and equipment to ground

·   Test and certify all network cabling

·   Take care of all Red Line Drawings for final As-Built drawings

·   Maintained communications for the US military in various locations in Afghanistan

·   Proficient planner, surveyor, troubleshooting and installer

·   Daily, weekly and monthly progress reports

 

 

CAREER EXPERIENCE

Ampcus Inc.      Northeast region                                                                                                                           April 2014-present

IT Infrastructure Engineer

·   Provide input in all planning meetings

·   Make site visits to insure contractors are following job specs and standards

·   Send reports to the USARC G6 for review

EMW Inc.-Bagram Afghanistan                                                                                                    May 2013-May 2014

Cable installer

·   Installation of cable tray, Cat6A shielded cable, and racks

·   Bonding all cable tray, racks, and cables

·   Testing and troubleshooting cables

·   Terminating Fiber Optic and Copper cabling

 

Isis Innovations LLC- All Afghanistan                                                                                                         May 2011- Dec 2012

Project Manager

·   Responsible for Isis Innovation’s compliance to the Army’s I3MP program across the Afghanistan theater

·   Supervise, train and evaluate staff up to 55 employees. in charge of ordering materials, meet with the Army planning staff on expansion of the base to provide communication support for the military

·   Have supervised 15 OSP project in Afghanistan totaling APX. 100 Man Holes and thousands of feet of optical fiber and multi pair copper cable. And getting all deliverable’s, such as site drawings, footages and all as built drawings turned into the military without missing a deadline

·   Terminating Fiber Optic and Copper cabling

 

 

 

USIDC Inc. - Kabul, Afghanistan (Camp Phoenix) Aug 2009 – May 2011

Country Manager / Project Manager

·   Responsible for USIDC’s compliance to the Army’s I3MP program across the Afghanistan theater

·   Supervise, train and evaluate staff up to 55 employees. in charge of ordering materials, meet with the Army planning staff on expansion of the base to provide communication support for the military

·   Have supervised 8 OSP project in Afghanistan totaling APX. 50 Man Holes and thousands of feet of optical fiber and multi pair copper cable. And getting all deliverable’s, such as site drawings, footages and all as built drawings turned into the military without missing a deadline

·   Terminating Fiber Optic and Copper cabling

 

ITT Systems - Bagram, AfghanistanAug 2008 - Aug 2009

Outside Plant (OSP) Supervisor

·   Supervise, train and evaluate staff up to 55 employees. in charge of ordering materials, meet with the Army planning staff on expansion of the base to provide communication support for the military

·   Install and maintain required copper and fiber cables.

·   Terminate and test cables.

·   Attend planning meeting s for future required communications

·   Terminating Fiber Optic and Copper cabling

 

 

CNR Communications – Seguin, TX2004-2008

Project Manager/Lead Technician

·   Installed voice, data and fiber optic cabling to support multiple military installations and Universities.

·   Managed project to install wireless access points.

·   Terminating Fiber Optic and Copper cabling

·   Testing Fiber Optic and Copper cables

 

TSI Inc. – Waco, TX2003-2004

Project Manager/Lead Technician

·   Managed team to install structure cabling throughout warehouse and office space. $90K project.

·   Troubleshooting and maintaining structure cabling.

·   Supervised and trained 10 to 20 technicians.

 

Carroll Systems -Austin, TX2001-2003

Project Manager/Lead Technician

·   Supervised, trained, and evaluated 10 technicians.

·   Install, troubleshoot and maintain cabling to include data and fiber optics.

·   Splice copper multi pair and fiber.

·   Terminate 66, 110 blocks, patch panels and cat5/6 modular plugs.

·   Managed dispatch team throughout United States.

 

ACS Dataline – Austin and Houston, TX1995-2001

Lead Technician

·   Supervised multiple projects with 10 employees installing new structure and OSP cabling for Dell, Cisco, Alcon Surgical and various school districts.

·   Supervised operation and maintenance contract with Motorola with 30 technicians.

·   Four time technician of the month awards and technician of the year award.

 

EDUCATION

 

Leander High School - Leander, TX1978

High School Diploma

 

 

 

 

PROFESSIONAL CERTIFICATIONS

 

BISCI ITS Technician Installation Program Certification1999

 

 

OSHA 30 Training in Construction Safety & Health 2010

 

 

 

Additional Certifications: 

Avaya, Belden, Panduit, Leviton, Ortronics, Hellermann Tyton, Sumitomo Air Blown Fiber, Seimon, Draka Molex, Hubbell

 

OTHER

 

Active Secret Clearance - Expiration 2018

CRC Attended in Aug 2008

Passport - Exp 2016

CAC – Expiration Date August 2016

Has Helmet and Flight Vest – MILAIR Flight Ready

Prefers Kandahar if possible

 

 

References upon request

 



Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-TX-San Antonio